All courses / AI Developer / Module 1 / Chapter 3
Learning objectives
After the lesson the participant can:
- Classify a claim about AI and developers as measured, surveyed, vendor or argued, and state how far it carries
- Explain why the three productivity results in the chapter cannot describe the same quantity
- Compare the adoption claims of Nordvik Region and Hansa Mutual with the measurements behind them
- Draft a work-and-load map for one sprint that shows where a tool could take part
Key concepts
- Four grades of evidence
- Measured rests on a study with a stated sample and method or an official text; surveyed on self-reported answers; vendor on a study by a company that sells in the area, read as a hypothesis; argued on reasoning from mechanism, only as strong as its premises.
- Perceived and measured speed
- In the randomised trial with 16 experienced open-source developers, allowing AI tools increased completion time by 19 per cent although the developers had forecast a 24 per cent reduction. The chapter uses it to show that belief about speed and measurement of speed can diverge.
- Duties attach to named parties
- The AI Act, the Cyber Resilience Act, the Product Liability Directive, NIS 2 and DORA address deployers, manufacturers, entities and management bodies. The chapter's implication is that none of these duties moves to a tool.
- Evidence age
- A claim has a date and an expiry. Under the defaults the book uses, usage figures expire after 90 days and value claims after 180 days; Nordvik's usage figures had expired by July 2030 and its 'a third faster' claim lapses in October 2030, and Hansa's 42 per cent of committed lines was past expiry.
- Work-and-load map
- An estimate by the developer of one sprint's hours by activity, with interrupted hours, the usage mode in which a tool could take part and the degree the delegation profile allows. It is compared at team level, never per named person.
Interactive exercises
Do them here and get feedback at once. Choose a card and then where it belongs, or drag it.
Interactive exercise 1 · Sort
Grade the evidence
Sort each claim or source into the grade the chapter gives it: measured, surveyed, vendor or argued.
Interactive exercise 2 · Scenario
Who may see the work-and-load map
Apply the chapter's practical guide on mapping a developer's week by activity, load and AI contribution.
Teaching plan
| 10 min | The teacher introduces the four grades and asks participants to grade three claims they have recently heard about AI and developers. |
| 20 min | Lecture on the five pressures, using the chapter's table of studies and the table that places every claim on its rung with its limit. |
| 10 min | Case reading: Nordvik's note to the executive committee and Hansa's figure in the board report, each set against what was actually measured. |
| 25 min | Exercise: each participant draws a work-and-load map for one sprint and marks the hours with and without a tool touchpoint. |
| 10 min | Plenary on the conclusion of Part I: where in the maps the strain on proving and owning shows. |
Discussion
- The chapter concludes that the headcount expectation outruns the evidence in both directions. What would a measurement have to tie together before a smaller team could be defended?
- Why does the chapter treat the written duties as firmer ground than any of the productivity or security studies?
- The work-and-load map is an estimate by the developer and is compared only at team level. What would be lost, and what risked, if it were built from instrumented data instead?
Written exercise
Exercise · 25 minutes
Map one sprint by activity, load and AI contribution
For your own last sprint, or for a senior developer in Nordvik Region's case platform team, list the activities under the headings read and understand code, write code and tests, review colleagues' changes, specify and clarify, release, document, and meet and coordinate. Estimate the hours of each and the hours that were interrupted. For each activity enter the usage mode in which a tool could take part and the degree of delegation the team's profile allows for that work class. Mark the hours with no tool touchpoint and those where only Level 0 Advisory is allowed. State the basis and the evidence age of the estimate.
Deliverable: A work-and-load map for one sprint with hours, interruptions, tool touchpoints by mode and degree, and a stated basis.
Self-test
Choose an answer to see whether it is right, or open the answer below each question.
How does the chapter grade Veracode's report on generated code and GitClear's analysis of changed lines?
Show the answer
C. As vendor evidence, useful as a hypothesis and weak as a finding
Both come from companies that sell a tool or service in the area. The chapter reads such work as a claim by an interested party: useful as a hypothesis, weak as a finding.Nordvik Region's executive committee was told that the pilot made developers 'a third faster'. What did the claim rest on?
Show the answer
B. IDE telemetry of a 31 per cent acceptance rate and a survey answered by 9 of 12 developers
The note rested on an acceptance rate and a survey of 9 of the 12 pilot developers; nobody had measured delivery time. The sample of 40 pull requests belongs to Hansa Mutual.What is the chapter's own conclusion for the whole of Part I about where the strain on the developer role falls?
Show the answer
A. On the capacity to prove and to own, more than on the capacity to produce
The chapter argues that a faster generator moves the limit to review and ownership: the pressures strain the capacity to prove and to own, not the capacity to produce.